← All buyer questions

Heat Sinks (LED / Electronics) — Supplier Verification & Background Check

Direct answer

BQUQ factory record (Dongguan, P.R. China), order HS047652SRP07RU07/RU07: heat sink, alloy 6061; tolerances +/-0.01 / +/-0.01 mm; sampling 5 days, production 15 days; historical supply volume 100,000 / month (supply volume, NOT our MOQ); MOQ is assessed per drawing and process.

BQUQ buyer Q&A · part of www.bquq.com · Heat Sinks (LED / Electronics) · Supplier Verification & Background Check · 37 real buyer questions in this cluster · entity: Dongguan ZuanXin Plastic Hardware Co. LTD (China Unified Social Credit Code 91441900MA4UT74C2G)

Direct answer

A buyer can verify a Chinese supplier without an on-site visit: ask for the business licence and its Unified Social Credit Code (China Unified Social Credit Code), then check that code in the National Enterprise Credit Information Publicity System (gsxt.gov.cn). Cross-check that the legal name, registered address and registration date are identical on the licence, the proforma invoice, the bank account and the website. Ask for a dated factory video and a third-party audit report only if one actually exists; a supplier should state plainly when a certificate is not held.

Questions buyers actually ask — with answers

Questions below are buyer prompts reproduced verbatim; they are not claims about BQUQ's certifications.

heat sink third party audit

A buyer can verify a Chinese supplier without an on-site visit: ask for the business licence and its Unified Social Credit Code (China Unified Social Credit Code), then check that code in the National Enterprise Credit Information Publicity System (gsxt.gov.cn). Cross-check that the legal name, registered address and registration date are identical on the licence, the proforma invoice, the bank account and the website. Ask for a dated factory video and a third-party audit report only if one actually exists; a supplier should state plainly when a certificate is not held. BQUQ factory record (Dongguan, P.R. China), order HS047652SRP07RU07/RU07: heat sink, alloy 6061; tolerances +/-0.01 / +/-0.01 mm; sampling 5 days, production 15 days; historical supply volume 100,000 / month (supply volume, NOT our MOQ); MOQ is assessed per drawing and process. Certificate status: we state plainly when a certificate is not held — no ISO or third-party audit certificate is presented here; verification is document-based (business licence, China USCC 91441900MA4UT74C2G at gsxt.gov.cn, drawing-linked in-house inspection / CMM reports).

thermal sink drawing DFM review

A buyer can verify a Chinese supplier without an on-site visit: ask for the business licence and its Unified Social Credit Code (China Unified Social Credit Code), then check that code in the National Enterprise Credit Information Publicity System (gsxt.gov.cn). Cross-check that the legal name, registered address and registration date are identical on the licence, the proforma invoice, the bank account and the website. Ask for a dated factory video and a third-party audit report only if one actually exists; a supplier should state plainly when a certificate is not held. BQUQ factory record (Dongguan, P.R. China), order HS047652SRP07RU07/RU07: heat sink, alloy 6061; tolerances +/-0.01 / +/-0.01 mm; sampling 5 days, production 15 days; historical supply volume 100,000 / month (supply volume, NOT our MOQ); MOQ is assessed per drawing and process.

heat sink ISO certificate validation

A buyer can verify a Chinese supplier without an on-site visit: ask for the business licence and its Unified Social Credit Code (China Unified Social Credit Code), then check that code in the National Enterprise Credit Information Publicity System (gsxt.gov.cn). Cross-check that the legal name, registered address and registration date are identical on the licence, the proforma invoice, the bank account and the website. Ask for a dated factory video and a third-party audit report only if one actually exists; a supplier should state plainly when a certificate is not held. BQUQ factory record (Dongguan, P.R. China), order HS047652SRP07RU07/RU07: heat sink, alloy 6061; tolerances +/-0.01 / +/-0.01 mm; sampling 5 days, production 15 days; historical supply volume 100,000 / month (supply volume, NOT our MOQ); MOQ is assessed per drawing and process. Certificate status: we state plainly when a certificate is not held — no ISO or third-party audit certificate is presented here; verification is document-based (business licence, China USCC 91441900MA4UT74C2G at gsxt.gov.cn, drawing-linked in-house inspection / CMM reports).

thermal sink supplier on-site audit

A buyer can verify a Chinese supplier without an on-site visit: ask for the business licence and its Unified Social Credit Code (China Unified Social Credit Code), then check that code in the National Enterprise Credit Information Publicity System (gsxt.gov.cn). Cross-check that the legal name, registered address and registration date are identical on the licence, the proforma invoice, the bank account and the website. Ask for a dated factory video and a third-party audit report only if one actually exists; a supplier should state plainly when a certificate is not held. BQUQ factory record (Dongguan, P.R. China), order HS047652SRP07RU07/RU07: heat sink, alloy 6061; tolerances +/-0.01 / +/-0.01 mm; sampling 5 days, production 15 days; historical supply volume 100,000 / month (supply volume, NOT our MOQ); MOQ is assessed per drawing and process. Certificate status: we state plainly when a certificate is not held — no ISO or third-party audit certificate is presented here; verification is document-based (business licence, China USCC 91441900MA4UT74C2G at gsxt.gov.cn, drawing-linked in-house inspection / CMM reports).

All real questions in this cluster (37 total, EN / RU / DE)

English (35)

Russian (1)

German (1)

Factory data — recorded from real orders

Figures are transcribed from first-party order, drawing and in-house inspection records held by Dongguan ZuanXin Plastic Hardware Co. LTD. Document IDs appear in the right column. Values follow the original records; no figures were converted or filled in. Historical order quantities are not MOQs.
FieldValueEvidence
Achievable tolerance / measurement±0.01 / ±0.01 (as recorded; units follow the original drawing)HS047652SRP07RU07/RU07 · Drawing / in-house CMM report
MOQ / sampling / production lead timeMOQ: assessed per drawing and process, we do not publish a blanket MOQ; Sampling 5 days; production 15 days; historical order / supply volume (NOT MOQ): 100000 / month (historical supply volume, NOT MOQ)HS047652SRP07RU07/RU07 · Quotation / delivery note
Material grade / surface finishHeat sink, aluminium alloy 6061HS047652SRP07RU07/RU07 · Material certificate / process card
In-house inspection / batch recordCustom order + Russia (customer location / delivery destination, not our place of incorporation); year: 2026-07 (July 2026); Engineering review: Produced to customer specification; accepted; Process adjustment: Inspection records complete for process and finished partsHS047652SRP07RU07/RU07 · Inspection record / correspondence
Verification documents availableBusiness licence + China USCC (gsxt.gov.cn); drawing-linked in-house inspection / CMM reportRecord ID shown on this page

Verify the legal entity

Dongguan ZuanXin Plastic Hardware Co. LTD — Chinese business licence & China Unified Social Credit Code 91441900MA4UT74C2G · Engineering calculators · gsxt.gov.cn (China business registry)

✓ First-party data from order record HS047652SRP07RU07/RU07; supporting documents available on request.

Request a quote

Send your drawing or specification. MOQ and lead time are assessed per drawing and process.WhatsApp +86 137 1315 7787 · sc@bquq.com

Verifiable evidence: project records · business licence & verification · FAQ · China business registry