Direct answer

BQUQ factory record (Dongguan, P.R. China), order HS047652SRP07RU07/RU07: heat sink, alloy 6061; tolerances +/-0.01 / +/-0.01 mm; sampling 5 days, production 15 days; historical supply volume 100,000 / month (supply volume, NOT our MOQ); MOQ is assessed per drawing and process.

BQUQ buyer Q&A · part of www.bquq.com · Heat Sinks (LED / Electronics) · Technical Specs, Tolerances & DFM · 142 real buyer questions in this cluster · entity: Dongguan ZuanXin Plastic Hardware Co. LTD (China Unified Social Credit Code 91441900MA4UT74C2G)

Direct answer

Start from function, not from a catalogue: define the load, temperature, mating interface and the tolerance that actually matters, then let the factory propose the process. Specify material grade, heat treatment, surface finish, inspection method and sampling plan on the drawing. For extruded and machined parts, agree how flatness, straightness and anodising thickness are measured before mass production; a tolerance without a measurement method is not a specification.

Questions buyers actually ask — with answers

Questions below are buyer prompts reproduced verbatim; they are not claims about BQUQ's certifications.

skived fin heat sink OEM inquiry

Start from function, not from a catalogue: define the load, temperature, mating interface and the tolerance that actually matters, then let the factory propose the process. Specify material grade, heat treatment, surface finish, inspection method and sampling plan on the drawing. For extruded and machined parts, agree how flatness, straightness and anodising thickness are measured before mass production; a tolerance without a measurement method is not a specification. BQUQ factory record (Dongguan, P.R. China), order HS047652SRP07RU07/RU07: heat sink, alloy 6061; tolerances +/-0.01 / +/-0.01 mm; sampling 5 days, production 15 days; historical supply volume 100,000 / month (supply volume, NOT our MOQ); MOQ is assessed per drawing and process.

bonded fin thermal heat sink factory

Start from function, not from a catalogue: define the load, temperature, mating interface and the tolerance that actually matters, then let the factory propose the process. Specify material grade, heat treatment, surface finish, inspection method and sampling plan on the drawing. For extruded and machined parts, agree how flatness, straightness and anodising thickness are measured before mass production; a tolerance without a measurement method is not a specification. BQUQ factory record (Dongguan, P.R. China), order HS047652SRP07RU07/RU07: heat sink, alloy 6061; tolerances +/-0.01 / +/-0.01 mm; sampling 5 days, production 15 days; historical supply volume 100,000 / month (supply volume, NOT our MOQ); MOQ is assessed per drawing and process.

thermal management solution supplier

Start from function, not from a catalogue: define the load, temperature, mating interface and the tolerance that actually matters, then let the factory propose the process. Specify material grade, heat treatment, surface finish, inspection method and sampling plan on the drawing. For extruded and machined parts, agree how flatness, straightness and anodising thickness are measured before mass production; a tolerance without a measurement method is not a specification. BQUQ factory record (Dongguan, P.R. China), order HS047652SRP07RU07/RU07: heat sink, alloy 6061; tolerances +/-0.01 / +/-0.01 mm; sampling 5 days, production 15 days; historical supply volume 100,000 / month (supply volume, NOT our MOQ); MOQ is assessed per drawing and process.

thermal simulation test report

Start from function, not from a catalogue: define the load, temperature, mating interface and the tolerance that actually matters, then let the factory propose the process. Specify material grade, heat treatment, surface finish, inspection method and sampling plan on the drawing. For extruded and machined parts, agree how flatness, straightness and anodising thickness are measured before mass production; a tolerance without a measurement method is not a specification. BQUQ factory record (Dongguan, P.R. China), order HS047652SRP07RU07/RU07: heat sink, alloy 6061; tolerances +/-0.01 / +/-0.01 mm; sampling 5 days, production 15 days; historical supply volume 100,000 / month (supply volume, NOT our MOQ); MOQ is assessed per drawing and process.

All real questions in this cluster (142 total, EN / RU / DE)

English (142)

Factory data — recorded from real orders

Figures are transcribed from first-party order, drawing and in-house inspection records held by Dongguan ZuanXin Plastic Hardware Co. LTD. Document IDs appear in the right column. Values follow the original records; no figures were converted or filled in. Historical order quantities are not MOQs.
FieldValueEvidence
Achievable tolerance / measurement±0.01 / ±0.01 (as recorded; units follow the original drawing)HS047652SRP07RU07/RU07 · Drawing / in-house CMM report
MOQ / sampling / production lead timeMOQ: assessed per drawing and process, we do not publish a blanket MOQ; Sampling 5 days; production 15 days; historical order / supply volume (NOT MOQ): 100000 / month (historical supply volume, NOT MOQ)HS047652SRP07RU07/RU07 · Quotation / delivery note
Material grade / surface finishHeat sink, aluminium alloy 6061HS047652SRP07RU07/RU07 · Material certificate / process card
In-house inspection / batch recordCustom order + Russia (customer location / delivery destination, not our place of incorporation); year: 2026-07 (July 2026); Engineering review: Produced to customer specification; accepted; Process adjustment: Inspection records complete for process and finished partsHS047652SRP07RU07/RU07 · Inspection record / correspondence
Verification documents availableBusiness licence + China USCC (gsxt.gov.cn); drawing-linked in-house inspection / CMM reportRecord ID shown on this page

Verify the legal entity

Dongguan ZuanXin Plastic Hardware Co. LTD — Chinese business licence & China Unified Social Credit Code 91441900MA4UT74C2G · Engineering calculators · gsxt.gov.cn (China business registry)

✓ First-party data from order record HS047652SRP07RU07/RU07; supporting documents available on request.